Bob Ware (5 Sep 2021)
"Genesis 1:1 Pyramid stone 2368 (JESUS CHRIST) is directly above the center point between stones 2021 and 2022"

2701 is the total gematria of the seven Hebrew words of Genesis 1:1. 2701 is the sum of all numbers from 1 to 73. John Tng created a pyramid with a base of 73 stones. He numbered the stones from the bottom up and from left to right. I colored these stone numbers blue. The capstone is stone number 2701. I numbered them from top to bottom and from right to left like Hebrew is read. I colored these stone numbers red.

 

2701 is also the product of the third and fourth Star of David numbers: 37 x 73. In this ‘Genesis 1:1 Pyramid’ with 2701 stones the center stone of the 37th and center row is blue stone number 2017. The 2017th composite number is the Greek gematria of ‘JESUS CHRIST’ (2368). A vertical line centered between blue stone numbers 2021 and 2022 points directly up to blue stone number 2368. 5782 spans both 2021 and 2022. 5782 begins at sunset on 6 September 2021. It will be 2701 days from the first Blood Moon eclipse of the last Tetrad on 15 April 2014 to 6 September 2021.

 

Most people I know believe the rapture will occur before the Tribulation begins. The first 1260 days of the Tribulation plus the additional 1290 days in Daniel 12:12 total 2595. Blue stone number 2595 is red stone 107 (the rapture number) and red stone number 2595 is blue stone 107. A line connecting both stone pairs, with values of 2595 and 107, passes directly through blue stone 2368. The 107th day of 5782 spans the 21st through 22nd days of December 2021. 22 December 2021 will be 10 x 153 days since the start date around the circumference of the ‘Circle of Jesus Christ’ (14 October 2917). 22 December 2021 is exactly 22 years since I was led to number the last days for the Body of Christ from the Winter Solstice of 5760 (the 21st through 22nd day of December 1999). The sum of the first 22 consecutive prime numbers is the prime number gematria of ‘JESUS CHRIST’ (713).

 

God placed His signature at the center of the 7 Hebrew words of Genesis 1:1 with the ‘Aleph’ and ‘Tav’. The gematria of the ‘Aleph’ is 1 and the gematria of ‘Tav’ is 400. 1 + 400 + 1967 (year of the Six Day War) equals: 2368. 5782 equals: 7 x 118 x 7. Psalms 118 is the center chapter of the 1189 Bible chapters. Psalms 118:9 has a gematria of 726. Strong’s Greek word number 726 is ‘harpazo’.

 

5782 is a leap year with 13 lunar cycles totaling 384 days. The center midpoint of 5782 falls at sunset in Jerusalem at 5:48 PM on 17 March 2022. The center point between 2021 and 2022 is midnight of 31 December 2021. The center point between these two dates and times in Jerusalem will be 8:54 AM on 7 February 2022. >From 7 February 2022 to the second total solar eclipse across the United States on 8 April 2024 will be 113 weeks.

 

7 February 2022 will be 10 x 1998 (or 30 x 666) days since the U.S.S. JFK was christened on 27 May 1967. 10 x 1998 equals 2 x 9990. 9990 is the sum of all 27 Hebrew and 27 Greek gematria values. 1998 is the gematria of the first five words of Genesis 1:1 and it is the sum of the ASCII codes for ‘JESUS CHRIST’ (855) plus ‘Jesus Christ’ (1143).

 

The 365 days in 2021 plus the 365 days in 2022 plus the 384 days in 5782 plus the 1480 Greek gematria of ‘CHRIST’ plus the rapture number 107 equals: 2701.

 

The 365 days in 2021 plus the 365 days in 2022 minus the 384 days in 5782 equals: 346. 346 plus 2022 equals the 2368 Greek gematria of ‘JESUS CHRIST’.

 

The exact average value of 2021 and 2701 equals the 2361 sum of all 260 New Testament chapter numbers.

 

The upper 72 rows of the ‘Genesis 1:1 Pyramid’ have a total of 2628 stones. 2628 equals the 260 chapters in the New Testament plus 2368.

 

Remove the outer ring of stones from the ‘Genesis 1:1 Pyramid’ and that will leave 2485 stones which is the 70th triangle number. 2485 equals: 2368 plus 117. The 117th day of 5782 spans the last hours of 2021 and the first hours of 2022. 117 days have 2808 hours. 2808 equals: 2701 plus the rapture number 107. This 117th day of 5782 will be the 855th day of the current 30-year Islamic calendar cycle. Again, 855 is the sum of the ASCII codes for ‘JESUS CHRIST’. 117 days plus 117 nights equals Vincent Tan’s 234.

 

I hope we get to go home no later than the start of 2022.

 

bobware88@gmail.com


GN 11 Pyramid basic with triangle sums and table.jpg

6-7-2021 Circles of Christ and Jesus Christ.jpg