Taylor (5 Jan 2014)
"ARIEL SHARON"


 
http://www.aish.com/jl/hol/hm/The_Bitter_Month.html

It is significant to note that the flood was originally intended to begin on the 11th of Cheshvan. However, Methuselah passed away, and thus the flood was delayed in deference to the seven-day period of mourning that followed his death.